Flexibility in use is critical in sustaining the life of your structure.  Our designs provide such flexibility ensuring structures can adapt to changing needs.

Structures can become compromised over time, as a result of damage from storms or collision, or from general wear & tear and ageing.

 

ClearTech provides specialist structural assessments and is proactive in our development of repair & strengthening solutions for buildings, bridges, towers, wind turbines, etc.

Repair can typically involve the use of jacking & monitoring or carbon fibre solutions. 


Post-tensioned structures exhibit enhanced durability and longevity, reducing the need for frequent repairs and replacements. 

This longevity, coupled with the adaptability and flexibility that PT provides, supports sustainable construction practices by extending the lifespan and usefulness of buildings.

  • Repairs & Jacking


    ClearTech has managed the installation and operation of a jacking system in order to transfer the loads via a specialised Jacking system, thus enabling the repair works to be undertaken.


    This service has been provided to Dublin Airport Authority, on a bridge repair works at Garvaghy Road, Northern Ireland, on a project at Belfast University, to assist with the redevelopment of a laboratory at Abbvie in Sligo, amongst others.


    In addition, we have designed and installed 2 permanent Flat Jacks to Structure 13, at the River Fergus Underbridge Ennis Bypass, Co. Clare

    Button
  • Slide title

    Repairs & Jacking


    ClearTech has managed the installation and operation of a jacking system in order to transfer the loads via a specialised Jacking system, thus enabling the repair works to be undertaken.


    This service has been provided to Dublin Airport Authority, on a bridge repair works at Garvaghy Road, Northern Ireland, on a project at Belfast University, to assist with the redevelopment of a laboratory at Abbvie in Sligo, amongst others.


    In addition, we have designed and installed 2 permanent Flat Jacks to Structure 13, at the River Fergus Underbridge Ennis Bypass, Co. Clare

    Button
  • Slide title

    Repairs & Jacking


    ClearTech has managed the installation and operation of a jacking system in order to transfer the loads via a specialised Jacking system, thus enabling the repair works to be undertaken.


    This service has been provided to Dublin Airport Authority, on a bridge repair works at Garvaghy Road, Northern Ireland, on a project at Belfast University, to assist with the redevelopment of a laboratory at Abbvie in Sligo, amongst others.


    In addition, we have designed and installed 2 permanent Flat Jacks to Structure 13, at the River Fergus Underbridge Ennis Bypass, Co. Clare

    Button
  • Slide title

    Repairs & Jacking


    ClearTech has managed the installation and operation of a jacking system in order to transfer the loads via a specialised Jacking system, thus enabling the repair works to be undertaken.


    This service has been provided to Dublin Airport Authority, on a bridge repair works at Garvaghy Road, Northern Ireland, on a project at Belfast University, to assist with the redevelopment of a laboratory at Abbvie in Sligo, amongst others.


    In addition, we have designed and installed 2 permanent Flat Jacks to Structure 13, at the River Fergus Underbridge Ennis Bypass, Co. Clare

    Button
  • Slide title

    Repairs & Jacking


    ClearTech has managed the installation and operation of a jacking system in order to transfer the loads via a specialised Jacking system, thus enabling the repair works to be undertaken.


    This service has been provided to Dublin Airport Authority, on a bridge repair works at Garvaghy Road, Northern Ireland, on a project at Belfast University, to assist with the redevelopment of a laboratory at Abbvie in Sligo, amongst others.


    In addition, we have designed and installed 2 permanent Flat Jacks to Structure 13, at the River Fergus Underbridge Ennis Bypass, Co. Clare

    Button
  • Slide title

    Repairs & Jacking


    ClearTech has managed the installation and operation of a jacking system in order to transfer the loads via a specialised Jacking system, thus enabling the repair works to be undertaken.


    This service has been provided to Dublin Airport Authority, on a bridge repair works at Garvaghy Road, Northern Ireland, on a project at Belfast University, to assist with the redevelopment of a laboratory at Abbvie in Sligo, amongst others.


    In addition, we have designed and installed 2 permanent Flat Jacks to Structure 13, at the River Fergus Underbridge Ennis Bypass, Co. Clare

    Button
  • Slide title

    Strengthening & Carbon Fibre


    As part of the design and/or retrofit of buildings, we have been requested to facilitate the installation of new stairways, which requires designing a strengthening system to support the new slab openings.


    This service has been provided at Bonham Quay in Galway, the old Canada House building - now AerCap House - on St. Stephen's Green in Dublin,  at TU Grangegorman in Dublin and at the Facebook offices in Ballsbridge, Dublin.

    Button
  • Slide title

    Strengthening & Carbon Fibre


    As part of the design and/or retrofit of buildings, we have been requested to facilitate the installation of new stairways, which requires designing a strengthening system to support the new slab openings.


    This service has been provided at Bonham Quay in Galway, the old Canada House building - now AerCap House - on St. Stephen's Green in Dublin,  at TU Grangegorman in Dublin and at the Facebook offices in Ballsbridge, Dublin.

    Button
  • Slide title

    Strengthening & Carbon Fibre


    As part of the design and/or retrofit of buildings, we have been requested to facilitate the installation of new stairways, which requires designing a strengthening system to support the new slab openings.


    This service has been provided at Bonham Quay in Galway, the old Canada House building - now AerCap House - on St. Stephen's Green in Dublin,  at TU Grangegorman in Dublin and at the Facebook offices in Ballsbridge, Dublin.

    Button
  • Slide title

    Strengthening & Carbon Fibre


    As part of the design and/or retrofit of buildings, we have been requested to facilitate the installation of new stairways, which requires designing a strengthening system to support the new slab openings.


    This service has been provided at Bonham Quay in Galway, the old Canada House building - now AerCap House - on St. Stephen's Green in Dublin,  at TU Grangegorman in Dublin and at the Facebook offices in Ballsbridge, Dublin.

    Button
  • Slide title

    Structural Assessments, Post Tensioned Site Investigation (PTSI) & Structural Repair


    All structures can become damaged by corrosion, accidental impact, brittle wire cracking, or coring and drilling after construction, leading to tendon failure.  In addition, Post-tensioned structures can have issues with corroded tendons due to a lack of grout in the ducts.


    A Post Tensioned Site Investigation (PTSI) is conducted to evaluate the concrete structure and assess the repair required.


    ClearTech can conduct the PTSI, providing a full structural assessment, calculation and consultation in order to determine the most effective, efficient, economical and sustainable repair solution.