ClearTech Engineered Solutions

Modern Methods of Construction

Modular and Post Tensioning

Modular : PPVC 3D Volumetric Designs

By optimizing material usage and minimizing waste, ClearTech engineers lean structures that deliver maximum performance with minimal environmental impact. Through BIM, we empower our clients to visualize, analyze, and refine their projects, ensuring that every aspect is meticulously planned and executed to perfection.


Modular Adoption will be highest in construction segments that feature one or more of the following factors:

A high degree of complexity, with multiple and/or sophisticated components that would benefit greatly from the time savings derived from off-site methods

A high degree of repetitiveness, either within or between projects, facilitating standardisation and economies of scale

Strict requirements regarding quality, cost, or onsite logistics.


Modular Design


Partnering with you for bespoke Design

     

The backbone of off-site construction is in the design for manufacture process (DfMA). By excelling at the front-end design we aim to eliminate the issues that plague conventional construction.

Our experienced modular design team can handle multiple projects concurrently using the most up to date technical software packages.


Source


Partnering with our manufacturers and suppliers to meet your design


With a ready-made design, we can oversee the manufacture with greater certainty, ensuring efficient and cost-effective supply.

Our business is based on connectivity & accessibly. With our supplier’s manufacturing base we can serve in-demand markets efficiently and effectively.


Manage


Partnering with your local contractor to co-ordinate the installation to your specific requirements


As experts in our field, we do not leave any clients with an unknown quantity or scenario.

Therefore we have developed an in-house project management team capable of managing the final lifting and module setting.



Post Tensioning Design

Post-tensioning tendons, which are prestressing steel cables inside plastic ducts or sleeves, are positioned in the forms before the concrete is placed. Afterwards, once the concrete has gained strength but before the service loads are applied, the cables are pulled tight, or tensioned, and anchored against the outer edges of the concrete. 

Post-tensioning is a form of prestressing. Prestressing simply means that the steel is stressed (pulled or tensioned) before the concrete has to support the service loads. 

Most precast, prestressed concrete is actually pre-tensioned : the steel is pulled before the concrete is poured. 

Post-tensioned concrete means that the concrete is poured and then the tension is applied, but it is still stressed before the loads are applied so it is still prestressed. 


A Post Tension solution can bring many advantages to the construction process and is one of the greenest forms of construction giving 25% savings in concrete and 75% savings in reinforcement for a similar RC construction. The knock on effects for labour materials and programme can be easily quantified.ou've chosen a terrific way of integrating images and text into your website. Move the image anywhere you want in this container and the text will automatically wrap around it. You can display events team members new products and more easily and creatively. To start add an image from the Image Picker and edit it as you would edit any image in the system. For example you can link the image to existing pages in your site a website URL a popup or an anchor. After you've chosen the image add your text. You can add text that describes the image you've selected or simply use the image for decorative purposes. \nYou've chosen a terrific way of integrating images and text into your website. Move the image anywhere you want in this container and the text will automatically wrap around it. You can display events team members new products more easily and creatively. To start add an image from the Image Picker and edit it as you would edit any image in the system. For example you can link the image to existing pages in your site a website URL a popup or an anchor. After you've chosen the image add your text. You can add text that describes the image you've selected or simply use the image for decorative purposes.

Advantages of Post-Tensioning ?


  • Improved constructability 
  • Less Material to be handled on site improving the BREEAM credits
  • Earlier stripping of formwork allowing improved programme  
  • Simpler formwork 
  • More Architectural freedom 
  • Larger column free spaces 
  • Flexibility in subdivision of office floors
  • Wide spanning or boldly cantilevering floors that leave generous space for lobbies and public areas
  • Slender elegant floors, roofs 
  • The same characteristics for demolition as reinforced concrete structures 
  • Flexibility for post forming holes for services
  • Reduced construction periods 
  • Reduced Slab thickness by up to 25% on Piled or Poor ground conditions 
  • Lower storey heights giving savings on façade, and vertical services
  • Reduced loads on foundations
Read our Case Study on Spencer Place, Dublin

Featured Projects

  • Commerical Development at Earlsfort Terrace, Dublin 2

    Commerical Development at Earlsfort Terrace, Dublin 2

    Button
  • Commerical Development at Earlsfort Terrace, Dublin 2

    Commerical Development at Earlsfort Terrace, Dublin 2

    Button
  • Commerical Development at Earlsfort Terrace, Dublin 2

    Commerical Development at Earlsfort Terrace, Dublin 2

    Button
See our other Structural Engineering Projects here
  • Slide title

    Dublin Airport Central

    Button
  • Slide title

    Dublin Airport Central

    Button
  • Slide title

    Dublin Airport Central

    Button
Share by: