ClearTech Engineered Solutions

BIM Services & Project Management

BIM Services

Central to ClearTech's approach is the integration of Building Information Modeling (BIM) into every aspect of our projects.  Leveraging the power of BIM, we create detailed digital models that serve as the foundation for efficient design, precise analysis, and streamlined construction. 


By optimizing material usage and minimizing waste, ClearTech engineers lean structures that deliver maximum performance with minimal environmental impact. Through BIM, we empower our clients to visualize, analyze, and refine their projects, ensuring that every aspect is meticulously planned and executed to perfection.


The need for the management of this asset to be continuous and complete, from the beginning to the end of its life, requires a high level of control.

BIM allows Project Managers can work with automated data, being able to see the relationships and use it to manage the process and, therefore, make better decisions, leading to better results particularly in relation to : Coordination. Time. Cost estimation. Programming.


2024


Kwasa Plot F, Kuala Lumpur, Malaysia


Kwasa Plot F is a 29 storey serviced apartment development in Kuala Lumpur, Malaysia. Comprising 573 units, this is to be constructed using modular construction technology.




  • Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button

Project Management

2015


Forth River Crossing, Edinburgh, Scotland


The Forth Replacement Crossing is a cable-stayed bridge which was to be constructed to the west of the existing Forth Road Bridge. The project is part of a package of transport improvements costing £1.45 to £1.6 billion and is on track to be delivered in 2016. The largest civil engineering project in Scotland for a generation, it will replace the current Forth Road Bridge as the main vehicle crossing of the Forth.

ClearTech Engineered Solutions scope was to provide Project Management and Technical Assistance, at Project Director level, to Cleveland Bridge UK, working with the international consortium consisting of Hochtief Solutions, American Bridge, Dragados and Morrison Construction.




2015


NLEX Northern Tollway, Manila, Philippines


The project, on which we provided Temporary Works Design and Project Management, consisted of the construction of 1498 AASHTO beam using precast moulds in a purpose built casting yard.  The yard required up to 12 moulds.  The casting yard was based in a disused rail maintenance facility and has been laid out as a combined batching plant casting area and storage area.

ClearTech designed the casting yard for Leighton Construction Asia.

The main challenges in this project related to the ground conditions at the casting yard and flooding in the area.

ClearTech designed the Gantry Rail as a continuous elastic beam, developing up ground improvement solution that reduced deflections on the beam, over the period of the project to +/- 5mm.